University of Utah - College of Nursing
Training Verification
TSN Equipment Trained On Training Date Download
35000
Ceiling Space (5th Floor)
1/21/2010
35001
Ceiling Space (3rd & 4th Floors)
1/28/2010
35002
Ceiling Space (2nd Floors)
2/18/2010
35005
Ceiling Space (1st and 2nd Floor)
4/12/2010
35006
Fire Sprinkler
6/10/2010
35007
Modular Lighting Controls (Lutron)
6/10/2010
35008
Network Lighting Controls (Douglas)
6/14/2010
35009
Unitech AHU
6/15/2010
35010
VFD
6/15/2010
35011
Pumps, Expansion Tanks, Heat Exchangers
6/15/2010
35012
High Temp Heat Exchanger
6/15/2010
35013
Water Softener
6/15/2010
35014
Valve Locations, Access Doors
6/15/2010
35015
Fire Dampers, Exhaust Fans, Relief Fans
6/16/2010
35016
Air Compressor, Vacuum Pump
6/16/2010
35017
Water Treatment, Glycol Makeup
6/16/2010
35018
Sump Pumps
6/16/2010
35019
Generator/ATS
6/18/2010
35020
Fire Alarm
6/18/2010
35021
UPS System
6/18/2010
35022
Electrical System
6/18/2010
35023
Nurse Call/Clocks
6/21/2010
35024
General Controls - Walk Thru
7/1/2010
35025
General Controls - Graphics
7/2/2010
35026
General Communications
7/26/2010
35027
Operable Partitions
8/2/2010
35028
Landscape Irrigation
8/2/2010
35044
Roller Shades
8/2/2010
35045
Mixing Valve
7/9/2010
35046
Door Hardware
8/2/2010

 

Letter of Transmittal
Company Signature Delivery Date Download
Utah New Vision Construction
Jim Fackrell
8/26/2010
Jacobsen Construction
Heather Soderquist
7/13/2010
Utah New Vision Construction
Jim Fackrell
8/26/2010