Snow College Library |
|||
---|---|---|---|
Training Verification |
|||
TSN | Equipment Trained On | Training Date | Download |
35003
|
Ceiling Space & Valve Locations |
2/19/2010
|
|
35004
|
VFD |
3/19/2010
|
|
35004-2
|
VFD (Mitsubishi) |
3/9/2010
|
|
35029
|
Lighting Controls & Network Lighting Controls |
5/25/2010
|
|
35030
|
Generator & Transfer Switch |
5/26/2010
|
|
35031
|
Fire Suppression System |
6/1/2010
|
|
35032
|
Fire Alarm |
6/1/2010
|
|
35033
|
Domestic Water Pumps |
5/26/2010
|
|
35033-1
|
Steam Condensate Pump |
5/26/2010
|
|
35033-2
|
Heat Exchangers |
5/26/2010
|
|
35033-3
|
Sanitary Sewage Pumps |
5/26/2010
|
|
35033-4
|
Sump Pumps |
5/26/2010
|
|
35033-5
|
Hydronic Pumps |
5/26/2010
|
|
35034
|
Split System Air |
5/26/2010
|
|
35035
|
Summer Boiler |
5/26/2010
|
|
35036
|
Electric Water Heaters |
5/26/2010
|
|
35037
|
Chemical Water Treatment |
5/26/2010
|
|
35038
|
Chiller |
5/26/2010
|
|
35039
|
Power Ventilators |
5/26/2010
|
|
35040
|
Air Handling Units |
5/26/2010
|
|
35041
|
Air Terminals / Unit Heaters |
5/26/2010
|
|
35042
|
Switchboard |
6/1/2010
|
|
35043
|
Building Controls |
6/24/2010
|
Letter of Transmittal |
|||
---|---|---|---|
Company | Signature | Delivery Date | Download |
Utah New Vision Construction
|
Jim Fackrell |
8/26/2010
|
|
Utah New Vision Construction
|
Jim Fackrell |
8/26/2010
|
|
Utah New Vision Construction
|
Phi St. Martin |
2/22/2012
|