Snow College Library
Training Verification
TSN Equipment Trained On Training Date Download
35003
Ceiling Space & Valve Locations
2/19/2010
35004
VFD
3/19/2010
35004-2
VFD (Mitsubishi)
3/9/2010
35029
Lighting Controls & Network Lighting Controls
5/25/2010
35030
Generator & Transfer Switch
5/26/2010
35031
Fire Suppression System
6/1/2010
35032
Fire Alarm
6/1/2010
35033
Domestic Water Pumps
5/26/2010
35033-1
Steam Condensate Pump
5/26/2010
35033-2
Heat Exchangers
5/26/2010
35033-3
Sanitary Sewage Pumps
5/26/2010
35033-4
Sump Pumps
5/26/2010
35033-5
Hydronic Pumps
5/26/2010
35034
Split System Air
5/26/2010
35035
Summer Boiler
5/26/2010
35036
Electric Water Heaters
5/26/2010
35037
Chemical Water Treatment
5/26/2010
35038
Chiller
5/26/2010
35039
Power Ventilators
5/26/2010
35040
Air Handling Units
5/26/2010
35041
Air Terminals / Unit Heaters
5/26/2010
35042
Switchboard
6/1/2010
35043
Building Controls
6/24/2010

 

Letter of Transmittal
Company Signature Delivery Date Download
Utah New Vision Construction
Jim Fackrell
8/26/2010
Utah New Vision Construction
Jim Fackrell
8/26/2010
Utah New Vision Construction
Phi St. Martin
2/22/2012
Wired Legacy