Sorenson Molecular Biotechnology Building - Ustar |
|||
---|---|---|---|
Training Verification |
|||
TSN | Equipment Trained On | Training Date | Download |
35101
|
Cage Wash CW/RW/TW |
10/27/2011
|
|
35109
|
Control Temperature Rooms |
11/7/2011
|
|
35113
|
Lab Air Compressor, Lab Vacuum, & Specialty Gas, Automatic Switch Over Panels |
11/14/2011
|
|
35114
|
VFD |
11/21/2011
|
|
35115
|
Edstrom Animal Watering & Lighting Software Program |
11/15/2011
|
|
35116
|
Edstrom System & Daily Logs |
11/16/2011
|
|
35117
|
Plumbing Specialties |
11/22/2011
|
|
35118
|
Grease Removal Equipment |
11/22/2011
|
|
35119
|
Water Softener |
11/22/2011
|
|
35120
|
Water Chemical Treatment |
11/28/2011
|
|
35121
|
Bryan Steam Dearator |
11/28/2011
|
|
35122
|
Lighting Controls |
11/28/2011
|
|
35123
|
Centrifugal Pumps |
11/29/2011
|
|
35124
|
Snow Melt |
11/29/2011
|
|
35125
|
Liebert Units |
11/29/2011
|
|
35126
|
Generators & Transfer Switch |
11/29/2011
|
|
35127
|
Air Handlers |
11/30/2011
|
|
35128
|
Chiller |
11/30/2011
|
|
35129
|
Acid Waste Neutrilization |
12/1/2011
|
|
35130
|
GE Gear |
12/1/2011
|
|
35131
|
Process Vacuum |
12/1/2011
|
|
35132
|
Power Ventilators & Corrosive Fans |
12/2/2011
|
|
35133
|
RO Systems - Day 1 |
12/5/2011
|
|
35134
|
Building Controls - Instrumentation & Controls For Nano, Alarms & Responses |
12/5/2011
|
|
35136
|
RO Systems - Day 2 |
12/6/2011
|
|
35137
|
Fire Alarm |
12/6/2011
|
|
35138
|
Fire Sprinkler System |
12/6/2011
|
|
35139
|
RO Systems - Day 3 |
12/7/2011
|
|
35140
|
Lancer Glass Washer |
12/7/2011
|
|
35141
|
UPS System |
12/7/2011
|
|
35142
|
Building Controls - HVAC Controls For Labs |
12/8/2011
|
|
35143
|
Boiler System |
12/9/2011
|
|
35144
|
Air Separators, Heat Exchangers, Steam System and Expansion Tank |
12/9/2011
|
|
35145
|
Building Controls - Walk Thru & Equipment Location |
12/12/2011
|
|
35152
|
Building Controls - Network Architecture |
12/14/2011
|
|
35153
|
Lamp Replacement |
12/14/2011
|
|
35154
|
Building Controls - Phoenix Equipment |
12/15/2011
|
|
35155
|
High Temp Converters |
12/15/2011
|
|
35156
|
Building Controls - Nano Walk Thru |
12/16/2011
|
|
35157
|
E-Mon D-Mon |
12/19/2011
|
|
35158
|
400/500HC Series Steam Sterilizer (Disc Provided by Mfg.) (No OnsiteTraining) |
1/4/2012
|
|
35159
|
Bulk Autoclave |
1/4/2012
|
|
35160
|
Kitchen Equipment |
00/00/00
|
Letter of Transmittal |
|||
---|---|---|---|
Company | Signature | Delivery Date | Download |
Layton Construction
|
Clint Bunnell |
1/9/2012
|