Utah Valley University - Pope Science Building
Training Verification
TSN Equipment Trained On Training Date Download
35165
Controlled Environment Room
3/7/2012
35166
Moveable Partitions
2/29/2012
35167
Overhead Doors
2/29/2012
35168
Marker Boards
2/29/2012
35169
Door & Door Hardware
2/29/2012
35170
Lab Equipment
3/7/2012
35171
Greenhouse System
3/2/2012
35172
Fire Alarm System
3/13/2012
35173
Medium Voltage Switchgear
3/13/2012
35174
Generator
3/1/2012
35175
Switchboards
3/1/2012
35176
Clocks
3/1/2012
35177
Lighting Controls & Dimming
3/1/2012
35178
Bag In Bag Out Filter
4/17/2012
35179
RO Systems
4/17/2012
35180
Auditorium Lighting
4/17/2012
35181
Tall Glass Washer
4/17/2012
35182
Acuity - Phoenix Systems
4/18/2012
35183
Building Controls
4/18/2012
35184
Security Systems
35185
Landscaping
35186
Domestic Water System
2/28/2012
35187
Phoenix Units
2/28/2012
35188
HVAC Piping
2/28/2012
35189
Air Handler Unit & Lab Exhaust
2/28/2012
35190
Roof Top Units
2/28/2012
35219
Lab Vacuum System
3/2/2012
35220
VFD
3/2/2012
35221
Acid Waste System
3/2/2012
35222
Sump Pumps
3/2/2012
35223
Exhaust Fans
2/28/2012
35224
Fuel Gas System
3/2/2012
35225
Marley Cooling Tower
2/23/2012
35226
Site Erected Cooling Tower
2/23/2012
35227
Chiller 5
2/23/2012
35228
Boiler System
2/23/2012
35229
Upper Central Plant
2/23/2012

 

Letter of Transmittal
Company Signature Delivery Date Download
Big D Construction
Wade Widdison
7/25/2012
Wired Legacy