Scheels - Sandy, Utah
Training Verification
TSN Equipment Trained On Training Date Download
35238
Building Controls (Day 1)
7/18/2012
35239
Heat Pumps
7/18/2012
35240
RTU - Roof Top Units
7/19/2012
35241
MAU - Makeup Air Units
7/19/2012
35242
Cooling Tower
7/19/2012
35243
ERV
7/19/2012
35244
Sump Pumps
7/19/2012
35245
Ejector Pumps
7/19/2012
35246
Hydronic Pumps
7/20/2012
35247
Boilers
7/20/2012
35248
Heat Exchangers
7/20/2012
35249
Water Heaters
7/20/2012
35250
Floor Heat
7/20/2012
35251
Snow Melt
7/20/2012
35252
Glycol System
7/20/2012
35253
Isolation Valves
7/20/2012
35254
Heat Pumps (Day 2)
7/25/2012
35255
Building Controls (Software)
7/25/2012
35256
Unit Heaters
7/26/2012
35257
Fan Coils
7/26/2012
35258
Air Curtains
7/26/2012
35259
CRV & Exhaust Fans
7/26/2012
35260
Water Softener
7/27/2012
35261
Communication Cabling
7/27/2012
35262
Enclosed Controllers
7/27/2012
35263
Pure Pulse System
7/27/2012
35264
Building Controls (Day 3)
8/1/2012
35265
Generator & Transfer Switch
8/1/2012
35266
Building Controls (Day 4) (Hands On Training) (No Video)
8/8/2012
35267
Kitchen Equipment
8/8/2012
35268
Irrigation (Curb-in)
8/9/2012
35269
Site Lighting Controls
8/9/2012
35270
Overhead Doors
8/9/2012
35271
Elevators & Escalators
8/9/2012
35272
Fire Alarm System
7/26/2012
35273
VFD
8/15/2012
35274
Switchgear
8/15/2012
35275
Fire Sprinkler System
8/17/2012
35276
Lighting Controls
8/29/2012

 

Letter of Transmittal
Company Signature Delivery Date Download
Q & D Construction
Tobin Basta
9/13/2012
Wired Legacy