Scheels - Rochester, MN
Training Verification
TSN Equipment Trained On Training Date Download
35406
Overhead Doors, Loading Dock, Security Grilles
3/3/2015
35407
TVSS, Switchboard, IFS
3/3/2015
35408
Fire Alarm
3/3/2015
35409
Fire Sprinkler & Nitrogen System
3/3/2015
35410
Sump Pumps
3/4/2015
35411
Shut-off & Isolation Valves
3/4/2015
35412
Boilers & Boiler Room Equipment
3/4/2015
35413
Floor Heat System & Snow Melt
3/4/2015
35414
Water Heaters & Grease Trap
3/4/2015
35415
Split System Units
3/4/2015
35416
Generator & Transfer Switch
3/5/2015
35417
CRV, RTU's & Exhaust Fans
3/4/2015
35418
Air Curtains
3/4/2015
35419
Building Controls (Hardware & Software)
3/6/2015

 

Letter of Transmittal
Company Signature Delivery Date Download
Q & D Construction
Andy Breen
3/23/2015